What's included
01
Site survey and condition assessment
02
Wear pattern and failure analysis
03
Shell temperature and heat-loss surveys
04
Thermal profile and layer design
05
Anchor and material selection
06
Lining drawings and bill of material
07
Heat-up and dry-out schedules
Where we do it
New installationsLinings failing before expected lifeHeat-loss and fuel reductionCapacity or fuel changes
Common questions
Can we hire you only for engineering?
Yes. Design, audit and commissioning are available as a standalone scope.
Why is our lining failing early?
Common causes are the wrong grade, poor anchoring, weak joints or a rushed dry-out. A site survey usually shows which.
Need material, a lining job, or both?
Send the grade and quantity for rates, or a drawing, BOQ or photo for a job quotation. We reply with a quick quotation.