ISO 9001:2015 certified. Manufacturer, supplier and lining contractor. +91 70140 37172jmd@jispl.net@jmd.jispl

Home / Industries / Power & boilers

Refractory and insulation for power plants and boilers

CFBC, AFBC and WHRB boilers face erosion, high gas velocity and temperature swings. We supply castables, anchors, bricks and insulation, and carry out boiler refractory work during planned outages and forced shutdowns.

Challenges we solve

01

Erosion in cyclones, bed areas and ducts

02

Anchor failure and castable spalling

03

Heat loss through casings and ducts

04

Forced outages that need fast repair

Equipment we supply for and line

CFBC and AFBC furnaces and cyclonesWHRB inlets and ductsThermic fluid heatersFlue gas ducts and chimneysAsh handling areas

Products for power & boilers

Supplied alone or with our installation. Technical data sheets on request.

Services for power & boilers

Common questions

Can you respond to a forced outage?

Yes. Call us with the problem; we confirm crew and material dispatch on the same call, from ready stock.

Do you also insulate ducts and piping?

Yes. We supply and apply LRB mattresses, rockwool and calcium silicate with cladding.

Can we buy material only?

Yes. Any product can be supplied alone, with our installation, or under an annual rate contract.

Need material, a lining job, or both?

Send the grade and quantity for rates, or a drawing, BOQ or photo for a job quotation. We reply with a quick quotation.

Quick quote

Tell us what you need

Enter your name.
Enter a valid phone number.

We reply quickly. Your details are used only to answer your enquiry.

WhatsApp